You haven’t read anything new here for a long time. This has to do with the fact that we had and have a lot of projects to realize. By the end of the year we will have built about 60 small plants up to 10 kwp. In addition, a number of larger plants. There was little time for maintaining the website.
Tag: solar system
64.32 kWp solarplant near Limburg
Within 4 days we have occupied 3 roofs. 2 trapezoidal sheets and a tiled roof.
Repowering near Hanau
Near Hanau an older plant was dismantled and rebuilt. Thereby lines and plug connections were renewed and the arrangement of the Modules adapted to the new roof!
Next week we’re going to have the strings lay, measure and hang up the inverter. Then also this building project be ready.
Solar plant near Aschaffenburg completed
Again we have built a solar plant. Near Aschaffenburg the 9.5 kWp plant was realized. A roof with skylights. It had to be done very carefully.
The team also did that very well. Thanks!
Again we have built a solar plant
On Thursday and Friday we have installed a 10 kWp system near Aschaffenburg. LG modules were installed.
Also Marzari replacement tiles. Due to the replacement tiles the bricks no longer need to be processed. The existing brick is removed and replaced by a metal plate from Marzari. At new roofs it should always be done this way.
Project in Frankfurt completed
On Monday and Tuesday we installed a 7 kWp PV system in Frankfurt.
It is 7 kWp nominal power with LG high performance modules (355 Wp). Furthermore Marzari replacement tiles were used.
Start of construction on a school in the Odenwald
We started construction on Saturday. There will be 301 Yingli modules installed. The nominal power of the system is 84.28 kWp.
4 SMA STP 20.000 will be used as inverters.