A successful year is coming to an end

You haven’t read anything new here for a long time. This has to do with the fact that we had and have a lot of projects to realize. By the end of the year we will have built about 60 small plants up to 10 kwp. In addition, a number of larger plants. There was little time for maintaining the website.

New company name

We will change the entry of the company in the commercial register in RJC UG (haftungsbeschränkt) & Co. KG.

This company will replace the Rolf Johann Consulting Company. We hope that we will be able to complete this by the end of the year.

Until then, we will act as RJC UG (haftungsbeshränkt) & Co. KG i.G. The managing director will be Rolf Johann.

64.32 kWp solarplant near Limburg

Solarplant near Limburg
Foto: Solaranlage bei Limburg
Foto: Solaranlage bei Limburg
Foto: Solaranlage bei Limburg
Foto: Solaranlage bei Limburg

Within 4 days we have occupied 3 roofs. 2 trapezoidal sheets and a tiled roof.

Repowering near Hanau

Photos: Repowering near Hanau
Photo: Repowering near Hanau
Photo: Repowering near Hanau

Near Hanau an older plant was dismantled and rebuilt. Thereby lines and plug connections were renewed and the arrangement of the Modules adapted to the new roof!

Next week we’re going to have the strings lay, measure and hang up the inverter. Then also this building project be ready.

Solar plant near Aschaffenburg completed

Photo: Solar plant near Aschaffenburg
Foto: Solaranlage bei Aschaffenburg
Foto: Solaranlage bei Aschaffenburg
Foto: Solaranlage bei Aschaffenburg
Foto: Solaranlage bei Aschaffenburg
Foto: Solaranlage bei Aschaffenburg

Again we have built a solar plant. Near Aschaffenburg the 9.5 kWp plant was realized. A roof with skylights. It had to be done very carefully.

The team also did that very well. Thanks!

Again we have built a solar plant

Photo: On the roof
Foto: Solaranlage in Aschaffenburg
Foto: Solaranlage in Aschaffenburg
Foto: Solaranlage in Aschaffenburg

On Thursday and Friday we have installed a 10 kWp system near Aschaffenburg. LG modules were installed.

Also Marzari replacement tiles. Due to the replacement tiles the bricks no longer need to be processed. The existing brick is removed and replaced by a metal plate from Marzari. At new roofs it should always be done this way.